By Lianfang Zhu, Ligang Dong, Chuanhuang Li (auth.), Haenakon Kim (eds.)

ISBN-10: 364229636X

ISBN-13: 9783642296369

ISBN-10: 3642296378

ISBN-13: 9783642296376

This e-book Advances in know-how and administration includes 116 complete size papers provided on the overseas convention on expertise and administration, hung on June 12-13, 2012, Jeju-Island, Korea. The target of ICTAM 2012 is to assemble researchers operating in lots of assorted components of know-how and administration to foster foreign collaborations and trade of latest ideas.

This quantity should be divided into sections at the foundation of the type of manuscripts thought of. the 1st part bargains with expertise. the second one part of this quantity includes management.

Show description

Read or Download Advances in Technology and Management: Proceedings of the 2012 International Conference on Technology and Management (ICTAM 2012), International Convention Center Jeju, Jeju-Island, Korea PDF

Best technology books

Download e-book for kindle: Phoenix: The Fall & Rise of Videogames (3rd Edition) by Leonard Herman

From Spacewar on mainframe pcs to Tetris on pocket organizers, Phoenix has been referred to as the definitive ebook about the background of videogames. inside of its pages you'll locate the Atari Pong, the Microsoft Xbox 360, and every little thing in among. yet this e-book is going past the whole historical past of videogames.

Download e-book for kindle: The Intel Trinity: How Robert Noyce, Gordon Moore, and Andy by Michael S. Malone

In keeping with unheard of entry to the corporation’s files, The Intel Trinity is the 1st complete heritage of Intel Corporation—the crucial corporation of the electronic age— instructed in the course of the lives of the 3 most crucial figures within the company’s historical past: Robert Noyce, Gordon Moore, and Andy Grove.

Komplexitat: Warum die Bahn nie punktlich ist - download pdf or read online

Die Bahn ist komplex – aber kann sie nicht auch pünktlich sein? Müssen technische Systeme immer komplexer werden? Und wie können wir sie trotzdem beherrschen? Auf anschauliche Weise geht der Autor diesen Fragen nach. Er untersucht zahlreiche Modelle aus Natur und Technik und erläutert, worin deren Komplexität besteht.

Extra resources for Advances in Technology and Management: Proceedings of the 2012 International Conference on Technology and Management (ICTAM 2012), International Convention Center Jeju, Jeju-Island, Korea

Example text

However, whether it should issuing coupons to other cities and to which one are difficult decisions for Hangzhou government. As the residents likeness of travel and their willingness to spend on travel are different in different regions, so the issuance of travel coupons must be geographically targeted. People's preferences and expenditure budget are the main determinant of travel demand. Intentional standard of tourism consumption reflects people's travel preferences and psychological expectations of travel costs, and also quantitatively reflect the potential tourism demand [1].

The length 220m is equal approximately to the critical mining length 210m which gained in the similar material simulation and to the 215m which calculated by the equation (13). All are showed in Table2. Research of the Mining Subsidence in TongChuan Mining Area 19 (13) subsidence (mm) 1000 800 600 400 200 0 0 200 600 400 800 mining length (m) Fig. 3. The scatter diagram showing the relation between extraction length and the maximum of surface subsidence Table 2. Critical mining lengths calculated on different method method of calculation critical mining length (m) Deviation (m) Calculated by catastrophe theory 215 Calculated by similar material simulation 220 observation result on mining area 210 -5 10 0 5 Conclusions Under the condition of large mining depth and small mining high and geological conditions of thin and loose layer of thick bedrock: (1)Based on the theory of the key stratum, it was found that the key stratum is bottom moderate coarse sandstone of Permian system shiqianfeng formation with the thickness of 42m; (2)Based on the catastrophe theory, the recognition model of the hazard occurrence of mining subsidence is established, namely l ≥ 2 h 3 π 2E 3q ; (3)With the method of similar material simulation, 220m recognition model of mining subsidence hazard which was close to the observed value 210m realistically.

The method measures importance of an attribute by calculating the cumulative change of output value caused by the changed value of Prediction Model of Software Development Effort Based on Input Output Correlation 47 sample attribute. For an attribute k , if its output value changes most based on the change of sample attribute value, then it is clear that attribute k is important. Otherwise it explains that attribute k is less significant for prediction. The method forms the following formula: C ( k ) = ∑ x(i, k ) − x( j, k ) × sign y (i) − y ( j ) i≠ j (1) where C (k ) is the input output correlation value of attribute k .

Download PDF sample

Advances in Technology and Management: Proceedings of the 2012 International Conference on Technology and Management (ICTAM 2012), International Convention Center Jeju, Jeju-Island, Korea by Lianfang Zhu, Ligang Dong, Chuanhuang Li (auth.), Haenakon Kim (eds.)


by Christopher
4.5

Rated 4.03 of 5 – based on 27 votes